03 April 2009: ater entering confined space ends in death of welder...26 March 2009: Four dead, six injured in east China refrigerated warehouse fire...21 March 2009: Empress Had Sprinklers Off Before Fire...18 March 2009: Central London fire hits immigration tribunals...25 February 2009: Site Inspection Goes 'Sauer,' OSHA Serves $41,400 Fine...24 February 2009: Firm cited in worker death $56,000 penalty may be levied for safety violations...17 February 2009: Welder at Boardman plant dies after explosion ...
Home |Frequently Asked Questions | Loss History | Downloads | Products | About | Contact | Disclaimer
PLANT ISOLATIONS

Issuing Permits - The issue of permits is strictly controlled, permits can only be issued by authorised personnel.

PERMIT NUMBER:
CONTRACTOR (Company):
CONTRACTOR (Employee Name):
LOCATION OF WORK (Exact):
DESCRIPTION OF WORK:
DETAILS OF ISOLATIONS REQUIRED:
DETAILS OF OHER SAFETY MEASURES REQUIREED:
Date Work to be Commenced:
Time:
Date Work to be Completed:
Time:
I declare that the above has been made known to the competent person in charge of the work and consider the above mentioned area to be safe for the competent person to commence work.
Signed:
Date:
Permit Controller:
Time:

Acceptance by competent person prior to commencement

I understand the work that is to be carried out and the safety precautions that are necessary to complete the work safely as outlined in the appropriate method statement and risk assessments. If conditions are such that the method statement and risk assessments become invalid it is my responsibility to stop work immediately and notify the person who authorised this permit to work. The disposal of any residues of the hazardous materials used will be in accordance with the Environmental Protection Act.

Signed:
Date:
Competent Person:
Time:

Continuation of Work

I hereby authorise the work specified above to continue until the time stated below and that I have checked the safety arrangements and confirm that they remain adequate.
Permit has been extended to:
am / pm
Signed:
Date:
Permit Controller:
Time:

I have checked the safety arrangements and am satisfied and agree to accept responsibility to complete the specified work by the revised time.

Signed:
Date:
Competent Person:
Time:

Permit Cancellation

This permit is cancelled. The work is / is not complete. Safety precautions have / have not been removed.

Signed:
Date:
Permit Controller:
Time:

Completion of Work
Final check by Contractor / Employee

I declare that the work described above is complete all work equipment, persons and materials under my control have been withdrawn. All safeguards have been reinstated and the work area returned to a safe status and service.

Signed:
Date:
Competent Person:
Time:

Completion of Permit - Permit Controller

I declare that the permit is now closed and I have received copies of the permit back from the Competent Person. The area has been inspected and is free from risk and all fire protection systems have been reinstated to their normal operating status.

Signed:
Date:
Permit Controller:
Time:

PLANT TO BE ISOLCATED FROM FORMS OF ENERGY* OR HAZARDOUS SUSBSTANCES

ENERGY SOURCES
GAS
HYDRAULICS
PNEUMATICS
ELECTRICAL
HAZARDOUS SUBSTANCES
CHEMICAL
DUST
NOISE
OTHER

* FOR THE ISOLATION OF ELECTRICAL ENERGY COMPLETE THE ELECTRICAL PERMIT TO WORK

The following flow chart should be used as a guide:

Plant Isolations Flow Chart
Quick and complete control of permits and contractors software tool. Click here to watch the guided tourWatch the guided tour Single user 195 multi user 495 annual license
Home | About | Contact | Products | Guides

QRIMS LTD - 1c Allenbrooks Way, Wymondham, Norfolk, NR18 0NW, United Kingdom
Copyright 2003 - 2008. © QRIMS Ltd